Operationally biased projects vary, with examples throughout the 'lifecycle' including:

Design:

A SE Asian Operator reduced the diameter of a proposed pipeline - BPA demonstrating that a smaller line saved capital and operating costs, with future demand met by other capacity enhancement techniques.

Commissioning:

In Portugal , BPA provided operations management personnel to generate procedures and support the local team, transferring knowledge from our UK system operation.

Operation:


BPA defined the operating organisation structure, resource requirements, roles and responsibilities for operation of the Turkish section of the Baku-Tblisi-Ceyhan (BTC) Pipeline system.

Integrity:

BPA utilise its integrity management capability to review the 'fitness for purpose' of pipelines in Kuwait using output data from On Line Inspection - including development of a phased remediation strategy.

Modification:


BPA established technical and cost requirements for conversion of a 100km crude pipeline in SE Asia to gas service.

 

 

Enhancement:

BPA's benchmarking service identified a major discrepancy in the power costs of a major European pipeline operator, leading to savings of £1 Million per year.

Decommissioning:


Review of a quayside terminal in Ireland determined de-commissioning requirements. BPA managed the entire process including the cleanup of ground with over 30 years of oil contamination.

4 News
..................................................

3 April 2012:
 

BPA Celebrates Success in the RoSPA Awards 2012

 
  Read more>  
..................................................

2 March 2012:
  SCADA System upgraded on Gas Supply Pipeline

 
  Read more>  
..................................................

2 February 2012:
  Pipeline Design for New CCGT Power Station Completed

 
  Read more>  
Legal Disclaimer
Privacy Statement
Terms & Conditions
Site Map
Copyright ©2010 BPA