- • Buncefield Terminal Redevelopment
- • Thames Pumpstation Rebuild
- • Booster Station Refurbishment
- • Kuwait Pipeline Design
- • Operation, Maintenance and Management Services for the Colnbrook Rail Terminal and Colnbrook Pipeline
- • SCADA System Replacement Project
- • Pumpstation Rebuild and Pipeline Recommissioning
- • Secondary and Tertiary Containment Enhancements
- • Aviation Fuel Tank Construction and Commissioning
- • Petroleum Supply Depot Technical Consulting
- • Design and Build of a 24″ Gas Pipeline
- • Design and Construction of a Multi-product Pipeline in Malaysia
- • Military Fuel Infrastructure Inspections
- • New Aviation Fuel Bulk Storage Tank Construction
- • Bowling Spur Pipeline Technical Consulting
- • Bacton – North Walsham Gas Condensate System Operation and Maintenance
- • North Walsham Gas Condensate Rail Loading Conversion to Bottom Loading and Vapour Recovery Design and Project Management
- • Cathodic Protection Consultancy for Crude Oil and Natural Gas Pipeline System in the Caspian Region
- • Fuel Storage COMAH Works
-
Secondary and Tertiary Containment Enhancements
The North Walsham Terminal (managed by BPA for over 30 years) is a lower tier COMAH ...
Read More... -
New Aviation Fuel Bulk Storage Tank Construction
BPA were commissioned to conduct a capacity study to review the Petroleum Storage Depot facilities at ...
Read More... -
Bacton – North Walsham Gas Condensate System Operation and Maintenance
BPA is the Statutory Pipeline Operator and COMAH Duty Holder (Control of Major Accident Hazards Regulations) ...
Read More... -
North Walsham Gas Condensate Rail Loading Conversion to Bottom Loading and Vapour Recovery Design a
BPA were commissioned to Project Manage (and act as Planning Supervisor under the CDM Regulations) the ...
Read More... -
Cathodic Protection Consultancy for Crude Oil and Natural Gas Pipeline System in the Caspian Region
BPA developed a Cathodic Protection strategy for the Caspian region WREP and NREP pipeline systems spanning ...
Read More... -
UKOP Risk Reduction Project
This was the second phase of a project initiated in 2012 to address ‘operational risk reduction’ ...
Read More... -
East Anglian Network Feeder Pipeline Operation and Maintenance
BPA is the Statutory Pipeline Operator of the East Anglian Network Feeder Pipeline (EAN) supplying commercial ...
Read More... -
Fuel Storage COMAH Works
Works were required at the Heathrow Airport fuel storage facility to meet the requirements of the ...