North Walsham Gas Condensate Rail Loading Conversion to Bottom Loading and Vapour Recovery Design and Project Management

BPA were commissioned to Project Manage (and act as Planning Supervisor under the CDM Regulations) the design and modification of the existing two loading gantries and installation of the new Vapour Recovery Unit.
A detailed Front End Engineering Design study was completed to provide costing and programme for the conversion of an existing fully operational open top loading system of North Sea Gas Condensate into rail cars into a bottom loading system. The revised facilities were designed to capture all vapours that would have previously escaped to atmosphere and recover these vapours via a new Vapour Recovery Unit back to the initial feed stock.