HS2 Pipeline Diversions
Release date

CASE STUDY

HS2 Pipeline Diversions

HS2 Ltd

High Speed Two (HS2) is a new high speed railway connecting major cities between north and south Britain. The project is being executed in two phases. Phase 1 will create a new high-speed line between London and Birmingham and Phase 2 will create two branches north from Birmingham on either side of the Pennines.

An assessment of the HS2 Phase1 proposed route identified the need for 2 pipeline diversions on the Blisworth to Kingsbury section of the UKOP pipeline system. As the UKOP Statutory Operator, BPA acted as owner’s engineer and was the principal designer for both pipeline diversion projects at Balsall Common (1.3km) and Burton Green (0.5km).

Service
Region / Country
Value (approximate)
For more information contact:

Hemel Hempstead (Head Office)
5-7 Alexandra Road
Hemel Hempstead
Hertfordshire
HP2 5BS
UK

Tel: +44 (0)1442 242200
Fax: +44 (0)1442 214077

Related case studies

Buncefield Terminal

Buncefield Terminal Redevelopment

West London Pipeline and Storage Ltd The objective of the project is to rebuild the bulk oil terminal which was destroyed in the Buncefield incident in December 2005. It involves the design and construction of 8 tanks (5 bulk storage, ...
Read More
Thames Pump Station

Thames Pumpstation Rebuild

UK Oil Pipeline Ltd The UKOP system is an oil products pipeline system owned by a consortium of UK oil companies, it is one of the most highly used, complex and fully automated multi-product installations of its kind – and ...
Read More
OIKIS Case Study

Pumpstation Rebuild and Pipeline Recommissioning

OIKOS Storage Limited, Pumpstation and Pipeline Following the refurbishment of their tank farm, OIKOS identified the need to recommission their 12″ pipeline for multiproduct duty and the transportation of various grades of refined petroleum products directly into the UKOP system ...
Read More
Scroll to Top