Case Studies
- All
- Engineering
- Operations
HS2 Pipeline Diversions
HS2 Ltd High Speed Two (HS2) is a new high speed railway connecting major cities between north and south Britain. The project is being executed in two phases. Phase 1 will create a new high-speed line between London and Birmingham ...
Read More Buncefield Terminal Redevelopment
West London Pipeline and Storage Ltd The objective of the project is to rebuild the bulk oil terminal which was destroyed in the Buncefield incident in December 2005. It involves the design and construction of 8 tanks (5 bulk storage, ...
Read More Thames Pumpstation Rebuild
UK Oil Pipeline Ltd The UKOP system is an oil products pipeline system owned by a consortium of UK oil companies, it is one of the most highly used, complex and fully automated multi-product installations of its kind – and ...
Read More Pumpstation Rebuild and Pipeline Recommissioning
OIKOS Storage Limited, Pumpstation and Pipeline Following the refurbishment of their tank farm, OIKOS identified the need to recommission their 12″ pipeline for multiproduct duty and the transportation of various grades of refined petroleum products directly into the UKOP system ...
Read More Pipe Bridge Removal
UKOP/WLPS BPA manages major hydrocarbon transmission pipeline systems and bulk storage assets in the United Kingdom on behalf of their owners. We offer over 40 years of experience in setting up, operating and maintaining facilities, reducing operating costs, increasing system ...
Read More UKOP Risk Reduction
Epping to Buncefield Pipelines This was the second phase of a project initiated in 2012 to address ‘operational risk reduction’ issues on a 40km section of the 750km UKOP multiproduct pipeline between Epping booster pumps station and the Buncefield terminal ...
Read More 