Pipe Bridge Removal
Release date

CASE STUDY

Pipe Bridge Removal

UKOP/WLPS

BPA manages major hydrocarbon transmission pipeline systems and bulk storage assets in the United Kingdom on behalf of their owners. We offer over 40 years of experience in setting up, operating and maintaining facilities, reducing operating costs, increasing system capacity and extending the operational life of oil and gas infrastructure. 

Service
Region / Country
Value (approximate)
For more information contact:

Hemel Hempstead (Head Office)
5-7 Alexandra Road
Hemel Hempstead
Hertfordshire
HP2 5BS
UK

Tel: +44 (0)1442 242200
Fax: +44 (0)1442 214077

Related case studies

HS2 Pipeline Diversions BPA

HS2 Pipeline Diversions

HS2 Ltd High Speed Two (HS2) is a new high speed railway connecting major cities between north and south Britain. The project is being executed in two phases. Phase 1 will create a new high-speed line between London and Birmingham ...
Read More
Buncefield Terminal

Buncefield Terminal Redevelopment

West London Pipeline and Storage Ltd The objective of the project is to rebuild the bulk oil terminal which was destroyed in the Buncefield incident in December 2005. It involves the design and construction of 8 tanks (5 bulk storage, ...
Read More
Thames Pump Station

Thames Pumpstation Rebuild

UK Oil Pipeline Ltd The UKOP system is an oil products pipeline system owned by a consortium of UK oil companies, it is one of the most highly used, complex and fully automated multi-product installations of its kind – and ...
Read More
Scroll to Top