UKOP Risk Reduction
Release date

CASE STUDY

UKOP Risk Reduction

Epping to Buncefield Pipelines

This was the second phase of a project initiated in 2012 to address ‘operational risk reduction’ issues on a 40km section of the 750km UKOP multiproduct pipeline between Epping booster pumps station and the Buncefield terminal facility. This work entailed the coordination of 3 distinct projects over a number of sites, all during a strict 5 day pipeline shutdown – only the second in the 40 year operating history of the pipeline.

The team (including BPA Operations staff and site Engineering project teams coordinating 6 specialist lead contractors, and 90 staff) delivered the upgraded pipeline back to Operations on time and within budget.

Service
Region / Country
Value (approximate)
For more information contact:

Hemel Hempstead (Head Office)
5-7 Alexandra Road
Hemel Hempstead
Hertfordshire
HP2 5BS
UK

Tel: +44 (0)1442 242200
Fax: +44 (0)1442 214077

Related case studies

OIKIS Case Study

Pumpstation Rebuild and Pipeline Recommissioning

OIKOS Storage Limited, Pumpstation and Pipeline Following the refurbishment of their tank farm, OIKOS identified the need to recommission their 12″ pipeline for multiproduct duty and the transportation of various grades of refined petroleum products directly into the UKOP system ...
Read More
Pipe Bridge Removal BPA

Pipe Bridge Removal

UKOP/WLPS BPA manages major hydrocarbon transmission pipeline systems and bulk storage assets in the United Kingdom on behalf of their owners. We offer over 40 years of experience in setting up, operating and maintaining facilities, reducing operating costs, increasing system ...
Read More
Fuel Storage COMAH

Fuel Storage COMAH Works

BAA Heathrow Airport Works were required at the Heathrow Airport fuel storage facility to meet the requirements of the COMAH Regulations (Control of Major Accident Hazards) and to enable the operator, Heathrow Airport Fuelling Company (HAFCO), to comply with its ...
Read More
Scroll to Top